Context

A computer-based interlocking (CBI) system is responsible for controlling signals and points to ensure safe train movements in a high-density rail network. In this domain, testing alone is not sufficient assurance for the safety-critical routing logic, because the set of possible route combinations and state transitions is too large to justify safety by sampling alone. This requirement focuses on the automated verification pipeline that ensures implementation code strictly adheres to the proven safety specification before any release.

Trigger

A release candidate of the safety-critical routing logic is submitted for safety verification.

Acceptance Criteria

  • 100% of safety-critical route-setting rules are represented in a machine-checkable specification linked to the release-candidate implementation baseline; source: specification coverage report; evaluation horizon: every release candidate.
  • 100% of generated proof obligations for the defined collision-prevention and point-consistency invariants are discharged, with 0 open counterexamples; source: formal verification report; evaluation horizon: every release candidate.
  • If any proof obligation fails or any counterexample is found, release promotion is blocked within 5 min and the failing invariant identifier and affected rule identifier are recorded in the verification log within 1 min; source: release-gate log and verification report; evaluation horizon: every release candidate.

See also: provable-railway-interlocking-safety for the domain-specific safety invariants and EN 50128 compliance details.